Thalorin
Capabilities

Rapid Compliance Baseline for New Acquisition Programs. Accelerate the transition from program initiation to compliance readiness. Establish security classification guides, system security plans, program protection foundations, and RMF integration before Milestone A—building the compliance infrastructure that programs typically scramble to create after development begins.

Abstract gradient
MDD→MS A
Full milestone coverage
4
Baseline artifacts generated
60%
Faster compliance readiness

The Early Advantage

New acquisition programs face a paradox. Compliance requirements are lightest at Material Development Decision when teams are smallest. By Milestone B, programs need approved PPPs, SCGs, SSPs, and RMF authorization packages.

Each deferred decision constrains future options and increases remediation costs exponentially.

Classification decisions without SCG foundations create derivative chaos
System boundaries defined without RMF require expensive re-architecture
CPI identification after engineering lock misses protection opportunities
Compliance Burden vs Flexibility by Phase
MDDMaterial Development Decision
15% burden95% flexibility
MS-AMilestone A
30% burden80% flexibility
MS-BMilestone B
70% burden40% flexibility
MS-CMilestone C
95% burden15% flexibility
Compliance Burden
Flexibility

Material Development Decision

Required Inputs
VCR
Validated Capability Requirements
AOA
Analysis of Alternatives Study Plans
IPC
Initial Program Protection Concepts
SSC
Sustainment Security Considerations
Thalorin Outputs
1
Compliance trajectory established before TMRR contracts
2
Security requirements flow into early development
3
Protection concepts inform technology strategy
4
Classification guidance ready for contractor engagement

Security Classification Guide

120
Business Days Target

New programs should complete initial SCGs within 120 business days of program initiation.

OCA coordination and element-by-element decisions frequently extend timelines. Thalorin manages interim guidance alongside developing SCGs.

Development Timeline
1-30
CMWG Formation

Establish Classification Management Working Group

31-60
Research

Analyze existing SCGs for similar programs

61-90
Classification

Assign levels to each information element

91-110
Review

OCA coordination and approval routing

111-120
Approval

Final OCA signature and distribution

System Security Plan Foundations

SSP development typically requires 3 to 12 months. Thalorin enables progressive development aligned with engineering maturity.

System Boundary

Define scope and authorization boundary

Control Implementation

Document security control status

Interconnections

Map external system interfaces

Roles & Responsibilities

Establish security accountability

Challenge

System architecture evolves while security documentation requires specificity. Programs defer SSP work until designs stabilize, then rush before authorization deadlines—sacrificing quality.

Solution

Establish SSP structure and inherited controls early, then incrementally populate system-specific content as architecture solidifies. By Milestone B, SSPs reflect actual system security.

Risk Management Framework

RMF's seven steps typically require 6 months to over 2 years and $3M+ for traditional ATOs. Programs engaging late face schedule delays when timelines exceed calendar time.

$3M+
Traditional ATO Cost
6-24
Months Timeline
7
RMF Steps
1
Prepare
Pre-MDD

Establish context, define roles, identify stakeholders, develop strategy

Thalorin integrates RMF planning into program workflows—guiding early categorization, identifying control baselines, and flagging implementation challenges before designs are locked.

Control Inheritance

Programs implementing 300+ controls independently face years of documentation. Programs inheriting 60% from authorized providers complete authorization in months.

60%potential control reduction

Through effective inheritance from authorized common control providers

Common Control Providers
Provider
Authorization
Coverage
FedRAMP Cloud
FedRAMP Authorization Act 2022
~60%
Platform One
DoD DevSecOps Platform
~45%
Enterprise Infra
Organizational Common Controls
~30%
Shared Services
Cross-Program Capabilities
~20%

Program Protection Plan Foundations

DoDI 5000.83 requires approved PPPs by Milestone A. Development must begin immediately after MDD to meet submission requirements.

45
Days before MS-A submission
MDD
Begin PPP immediately
Early Development Establishes
CPI identification framework before technology development
Horizontal protection coordination processes established
ASDB query preparation for protection awareness
PPP document structures ready for population

Thalorin initiates PPP foundations at program inception. As Technology Maturation progresses and critical technologies emerge, the framework captures them systematically. By Milestone A, PPPs reflect deliberate protection planning.

Accelerated Authorization

Traditional
18-24
months

Sequential RMF completion by dedicated security teams

Accelerated
8
weeks

With proper preparation, trained staff, and efficient methodologies

Requirements for Acceleration
Control Implementation

Correct the first time—rework extends timelines

Documentation Readiness

Assessment-ready before assessors engage

Evidence Collection

Collected continuously, not assembled retrospectively

Compliance Posture

Maintained throughout development cycle

Milestone A Package

Milestone A authorizes entry into Technology Maturation and commits significant resources. Programs arriving without complete compliance packages face delays, conditions, or failure.

Rebuilding under milestone pressure creates technical debt requiring later remediation.

Required Documentation
PPP
Program Protection Plan
With preliminary CPI identification
SCG
Security Classification Guide
Or interim classification guidance
CSS
Cybersecurity Strategy
As PPP appendix
TDS
Technology Development Strategy
Addressing security considerations
AS
Acquisition Strategy
With security requirements flowdown

Thalorin generates integrated packages—synchronizing PPP, SCG, cybersecurity strategy, and acquisition documentation for consistency across artifacts.

Platform Capabilities

MDD
MDD Package Generation

Protection concepts and AoA security inputs

SCG
SCG Accelerator

Template libraries and OCA tracking

SSP
Progressive SSP Dev

Incremental documentation alignment

RMF
Early RMF Integration

Categorization and baseline identification

INH
Inheritance Mapping

Common control provider documentation

PPP
PPP Foundation Builder

CPI framework and coordination

MST
Milestone Tracking

Status monitoring and gap identification

ATO
Accelerated ATO Support

Continuous compliance posture

SYN
Cross-Artifact Sync

Consistency validation

TRN
Transition Management

Execution-phase migration

NASA Program Compliance

NASA Logo

NASA Mission & Program Spin-Up Compliance

Accelerate Authority to Operate while navigating NPR 7120.5F lifecycle gates

NASA manages over 80 active science missions and 38 major projects representing $74 billion in lifecycle costs. Each new program must satisfy overlapping requirements from NPR 7120.5F (program management), NPR 7123.1D (systems engineering), and NPR 2810.1F (cybersecurity) before achieving operational status. The Authority to Operate process alone typically requires 6 to 18 months.

Program managers face a compounding burden: at System Requirements Review, preliminary IT security requirements must be documented. At Preliminary Design Review, the System Security Plan must be prepared and registered in RISCS. At Critical Design Review, security documentation updates based on design maturity. At Operational Readiness Review, the Plan of Action and Milestones must be finalized.

GRCM eliminates the rebuild cycle by maintaining a unified compliance posture across program lifecycle phases. Control decomposition maps NPR 2810.1F's 200+ FISMA controls to implementable steps with clear verification criteria. Evidence collected for PDR automatically carries forward to CDR and ORR gates.

Key Capabilities
NPR 7120.5F lifecycle phase alignment with automated gate readiness tracking
NPR 2810.1F control decomposition with FIPS 199 impact level inheritance
Parallel ATO workflow that synchronizes with program development milestones
POA&M tracking with risk-based prioritization and remediation timelines
Multi-mission portfolio view for program office oversight
80+
Active missions
$74B
Lifecycle costs

Key Metrics

120days

Target SCG development timeline

45days

PPP submission lead time before MS-A

8weeks

Accelerated ATO vs 18-24 months

60%

Control reduction through inheritance

$3M+

Traditional ATO cost reduction

3-12mo

SSP development duration

Ready to accelerate new program compliance?

See how Thalorin establishes security classification guides, program protection foundations, and RMF integration before Milestone A—building compliance infrastructure when investment is smallest and flexibility is greatest.